An air handler 35 feet up, down in two pieces
Golden · university campus building · 2026
One unit, thirty-five feet in the air, in a working campus building. No crane access. The job was getting it down without hurting anything under it.
The job
What we walked into
A large air handling unit was mounted high in a campus mechanical space, thirty-five feet above a floor with equipment and rails below it. There was no crane access and no way to bring it down whole.
The approach
How it went
- Cut the unit into two sections in place from a scissor lift, keeping each piece within what the rigging could control.
- Lowered each section on rope with the lift as the working platform, sequenced so nothing below was ever under a suspended load.
- Broke the sections down further on the floor, staged them, and hauled them out with the rest of the debris.
- Swept the space and photographed the mount cleared.
The result
Handed back
The unit came down in two controlled sections with a crew of four, no damage to the equipment or rails below it, and the space handed back clean.
Before, during, after
The record
Client and site names withheld until written approval. Photographs are BCK job documentation.
What the client got
The closeout
Scope-of-work completion verification, a captioned photo record by work area, recovery documentation where refrigerant was involved, and a certification of completion signed by both managing members. Delivered with the final invoice.